A high tolerance slab and retaining walls cast in a 5m deep cofferdam at the Teesworks Freeport.
The work included excavation, installing sheet piles, de-watering, drainage, a split level slab and a cast in frame for the drive rig.
Our role
Quantity surveying and commercial management on a short, technically demanding package where tolerances and sequencing left no room for commercial drift.