Leeds Bradford Airport, Meet & Greet Car Park

An 800 space car park and infrastructure scheme, including 12,000m² of earthworks, 1,500m of drainage and a 1,000m³ attenuation system.

Value
£2.5m
Form of contract
NEC4
Duration
6 months
Client
BCE Northern Ltd
End user
Leeds Bradford Airport
Location
Leeds Bradford
Our role
Subcontractor
The completed meet and greet car park at Leeds Bradford Airport

This project involved the construction of a large scale car parking and infrastructure scheme designed to accommodate 800 vehicles.

The works included approximately 12,000m² of earthworks, comprising cut and fill operations to achieve the required formation levels, along with the installation of 1,500 linear metres of surface water drainage. A geocellular water attenuation system totalling 1,000m³ was installed to manage surface water runoff in line with sustainable drainage requirements. The scheme also included the construction and surfacing of 11,000m² of permeable car parking.

Our role

Commercial management and quantity surveying for BCE Northern on a six month NEC4 package delivered alongside live airport operations.